Hanging
Sheets run to minimise butt joints, fasteners set to depth without breaking paper, and board held off the floor so it isn't wicking moisture.
Board, taping, mudding and finishing — flat walls, clean corners, no telegraphing seams.
Drywall is the surface every other finish sits on. Wavy board, proud screws or a seam that catches raking light will show through paint, panelling and trim forever.
We hang, tape and finish to the level the space needs — and we're honest about which level that is, because Level 5 on a hallway ceiling is money spent for nothing.
Sheets run to minimise butt joints, fasteners set to depth without breaking paper, and board held off the floor so it isn't wicking moisture.
Level 4 for most painted walls; Level 5 skim where gloss paint or heavy raking light will punish anything less.
Bead chosen for the situation — metal where it takes knocks, paper-faced for straight lines, bullnose where the design calls for it.
Sanding managed with vacuum-assisted tools and containment, because drywall dust gets everywhere and stays there.
We walk the property with you — grades, drainage, access, what you actually use the space for. No guesswork from a satellite photo.
A layout, material selections and a transparent line-by-line price. You see what you're paying for before anything is ordered.
Base prep done properly, materials from suppliers we trust, and a crew that cleans up at the end of every day.
We go over the finished work together, cover maintenance, and stand behind what we built.
Level 4 finishes joints and fasteners. Level 5 adds a skim coat over the entire surface so texture is uniform — worth it under gloss paint or strong side light, unnecessary otherwise.
Yes. Note that ceilings sprayed before the early 1990s can contain asbestos and should be tested first — we won't scrape an untested older ceiling.
Hanging and finishing a typical basement runs about one to two weeks depending on size and how many coats need drying time between them.
We do — running drywall and paint together means one crew owns the finished result instead of two trades blaming each other.
Driveways, patios, walkways, steps, pads and paving restoration — poured, finished and cured to hold up to Ontario winters.
Garden designGarden design, lawn care and maintenance — plus the grading, soil and drainage work that decides whether any of it survives.
PatiosPatios, walkways, driveways, retaining walls, fireplaces and interlocking — built on a base that won't move.
Send through what you're planning and we'll book a site visit. Call or text — whatever's easier.